Amey Rail – Taffs Well Tram Depot
Project Background: • Client: Amey Rail • Project: Construction of a new state-of-the-art tram depot in Taffs Well • Contract: NEC Challenges: Amey Rail encountered significant challenges not only in managing the project timeline and NEC compliance but also in integration across various disciplines, design & construction, and with existing Infrastructure. Complex Integration […]
Gateline Heaters Design
Scope: Our client engaged us to carry out detailed surveys and produce a detailed design report to aid them in assessing the impact, time, and cost of installing gate line heaters retrospectively in a station. The design report Project Safe produced for the client detailed the electrical design and bracketry required to support Gate-line heaters […]
Paddington Station Non-Potable Water
Scope Re-location of back of house cleaners sink due to room change of use. Provide a design and install new 1” copper pipe, bib tap and Belfast sink connecting into existing check valve. Remove and make good any existing bracketry, lagging and pipework. Delivery Project Safe produced a design to the current CIBSE W, […]
Paddington Station Drivers Mess
Challenge Deliver mechanical fit out and make room fire compliant in 2 weeks to avoid delaying handover to operator and entry into service. Solution Project Safe acting as subject matter experts, were able to review and amend the design to meet sub surface section 12 regulations saving time and money in the design review […]